Run your tests
After you design your project, configure your test settings, and define your scenario, you're ready to run your test in NeoLoad Web.
Before you start
You must perform the following actions before you can start a test run:
-
Adjust the test scenario to reflect your load goals.
-
Confirm that load generators are available.
-
Assign at least one controller for each test result.
Trigger a test run
To trigger a test run, follow these steps:
-
Go to Tests.
-
Select Configure.
-
Choose the project to run. Use the project details, such as size, upload date, uploader, and source, to guide your selection.
-
Choose how to run the scenario.
-
Select the load zones to run your test in.
-
Review the configuration, then select Run test.
Note: The test can either be stopped with a graceful stop or directly terminated. The warning in the dialog box helps you choose the appropriate way to end the test.
NeoLoad Web displays the test run in the Results tab. You'll see all test details, performance metrics, and logs. Everyone in your workspace can access and analyze the results.
What's next
To learn how you can use the Results tab, check out test results view.